A quick update to show that we're still moving forward. The tiles have been removed and the first two of the structural floor panels are in place. 

WhatsApp Image 2018-05-03 at 18.48.35 (1).jpeg  WhatsApp Image 2018-05-03 at 18.48.35.jpegWhatsApp Image 2018-05-03 at 18.48.36 (4).jpeg  WhatsApp Image 2018-05-03 at 18.48.36 (1).jpegWhatsApp Image 2018-05-03 at 18.48.36 (2).jpeg  WhatsApp Image 2018-05-03 at 18.48.36.jpeg

Comments

Popular posts from this blog

Overview

Nearly everything going on at the moment is about the roof. There's some digging work going on in the cellar and the ground floor, but pictures of holes and channels dug in the floor aren't as interesting. I'll add a separate post for the Roof once a little bit more is done. This post is all circular panorama shots from most of the rooms so we have a record of the process. Roof 2nd Floor 1st Floor Ground Floor

The Start

After a long time searching, looking at different houses, in various locations, putting in bids, being conned by estate agents that went back on promises and strange auction processes, we've found a house. It's not what we were originally looking for, but there are aspects that we love. The age (1763), the wooden beams running throughout the ceiling and the walls, the thickness of the walls which is due to it being part of the original town fortifications, all of this as well as the potential made us want to buy it.  We also see it as a means to be able to move onto something else, a way to stop paying rent and to start putting money into something that will be ours.

The Scaffolding is Up